How to pilot the production power ratio for filter
B
Benjamin
started a topic
5 days ago
Hi,
I want to pilot the value for the production power ratio used in the filter (export, custom, filter settings).
I need to change the value from 1.1 to 0.7 to maximize the delesting to hot water priority. Then when the boiler is closed to max temperature allowed ; i reduce the ratio to 0.7 to allow the charger to start.
Currently, due to the lag of hot water delester, sometimes the charger starts and "eat" the production power ... even if the water is not warm !
I have looked on the API MQTT but i don't find the parameter.
Benjamin
Hi,
I want to pilot the value for the production power ratio used in the filter (export, custom, filter settings).
I need to change the value from 1.1 to 0.7 to maximize the delesting to hot water priority. Then when the boiler is closed to max temperature allowed ; i reduce the ratio to 0.7 to allow the charger to start.
Currently, due to the lag of hot water delester, sometimes the charger starts and "eat" the production power ... even if the water is not warm !
I have looked on the API MQTT but i don't find the parameter.
https://openevse.stoplight.io/docs/openevse-wifi-v4/b5baa29d15e3a-update-the-evse-configuration
Any idea ?